Java Programming Training Classes in Delray Beach, Florida

Training Suggestions from the Experts

An Experienced Java developer must know

... everything or so it can seem.  A solid grasp and knowledge of Object Oriented Programming constructs such as inheritance, polymorphism, interfaces and reflection are essential.  Next in line is the knowldge to be able to import/export file data, running SQL queries, using regular expressions and, possibly, knowing how to write multi-threaded code and make socket connections.  A class that addresses most of these topics is:  Fast Track to Java 11 and OO Development.

For the more daring Java enthusiast and especially for those looking to become professional Java developers, knowledge of the Spring Framework is expected.  A perfect class for this is:  Fast Track to Spring Framework and Spring MVC/Rest.  Not only does this course provide students with a great introduction to spring, it goes beyond the basics with a solid delve into Spring and web development.

Another consideration is learning JBoss aka Wildfly, the free Application Server from RedHat.   JBoss has become the workhorse of most Java EE applications.  Add to that a class on Tomcat, the defacto servlet engine, and the student can be considered 'ready' for employment.

Call for Details: 303.377.6176

Learn Java Programming in Delray Beach, Florida and surrounding areas via our hands-on, expert led courses. All of our classes either are offered on an onsite, online or public instructor led basis. Here is a list of our current Java Programming related training offerings in Delray Beach, Florida: Java Programming Training

We offer private customized training for groups of 3 or more attendees.
Delray-Beach  Upcoming Instructor Led Online and Public Java Programming Training Classes
Fast Track to Java 17 and OO Development Training/Class 9 December, 2024 - 13 December, 2024 $2090
HSG Training Center instructor led online
Delray-Beach, Florida 33445
Hartmann Software Group Training Registration
Introduction to Spring 5 (2022) Training/Class 16 December, 2024 - 18 December, 2024 $990
HSG Training Center instructor led online
Delray-Beach, Florida 33445
Hartmann Software Group Training Registration

Java Programming Training Catalog

cost: $ 690.00length: 1 day(s)
cost: $ 2090length: 5 day(s)
cost: $ 1290length: 3 day(s)
cost: $ 1690length: 4 day(s)
cost: $ 2090length: 3 day(s)
cost: $ 1090length: 2 day(s)
cost: $ 2090length: 5 day(s)
cost: $ 2090length: 5 day(s)
cost: $ 1290length: 3 day(s)
cost: $ 1690length: 4 day(s)
cost: $ 2250length: 5 day(s)
cost: $ 1090length: 2 day(s)
cost: $ 2090length: 5 day(s)
cost: $ 1290length: 3 day(s)
cost: $ 1890length: 4 day(s)
cost: $ 690length: 2 day(s)
cost: $ 690length: 2 day(s)
cost: $ 2090length: 4 day(s)
cost: $ 2090length: 5 day(s)
cost: $ 2090length: 5 day(s)
cost: $ 2090length: 5 day(s)
cost: $ 2090length: 5 day(s)
cost: $ 2090length: 4 day(s)
cost: $ 1090length: 2 day(s)
cost: $ 1190length: 3 day(s)
cost: $ 690.00length: 1 day(s)
cost: $ 790length: 1 day(s)
cost: $ 690.00length: 1 day(s)
cost: $ 790length: 1 day(s)
cost: $ 1690length: 4 day(s)
cost: $ 1390length: 3 day(s)
cost: $ 1390length: 3 day(s)
cost: $ 1090length: 2 day(s)

JBoss Administration Classes

cost: $ 1290length: 3 day(s)

JUnit, TDD, CPTC, Web Penetration Classes

cost: $ 890length: 1 day(s)

Java Enterprise Edition Classes

cost: $ 1290length: 3 day(s)
cost: $ 1290length: 3 day(s)
cost: $ 1290length: 3 day(s)
cost: $ 390length: 1 day(s)
cost: $ 990length: 3 day(s)
cost: $ 2190length: 5 day(s)
cost: $ 1690length: 4 day(s)
cost: $ 1090length: 2 day(s)
cost: $ 2090length: 5 day(s)
cost: $ 1690length: 4 day(s)
cost: $ 1690length: 1 day(s)
cost: $ 2090length: 5 day(s)
cost: $ 1690length: 4 day(s)
cost: $ 1290length: 3 day(s)
cost: $ 790length: 2 day(s)

Java Programming Classes

cost: $ 2090length: 5 day(s)
cost: $ 2090length: 5 day(s)

Spring Classes

cost: $ 1290length: 3 day(s)
cost: $ 2090length: 5 day(s)
cost: $ 1290length: 3 day(s)
cost: $ 690.00length: 1 day(s)
cost: $ 1090length: 3 day(s)

Course Directory [training on all levels]

Upcoming Classes
Gain insight and ideas from students with different perspectives and experiences.

Blog Entries publications that: entertain, make you think, offer insight

In programming, memory leaks are a common issue, and it occurs when a computer uses memory but does not give it back to the operating system. Experienced programmers have the ability to diagnose a leak based on the symptoms. Some believe every undesired increase in memory usage is a memory leak, but this is not an accurate representation of a leak. Certain leaks only run for a short time and are virtually undetectable.

Memory Leak Consequences

Applications that suffer severe memory leaks will eventually exceed the memory resulting in a severe slowdown or a termination of the application.

How to Protect Code from Memory Leaks?

Preventing memory leaks in the first place is more convenient than trying to locate the leak later. To do this, you can use defensive programming techniques such as smart pointers for C++.  A smart pointer is safer than a raw pointer because it provides augmented behavior that raw pointers do not have. This includes garbage collection and checking for nulls.

If you are going to use a raw pointer, avoid operations that are dangerous for specific contexts. This means pointer arithmetic and pointer copying. Smart pointers use a reference count for the object being referred to. Once the reference count reaches zero, the excess goes into garbage collection. The most commonly used smart pointer is shared_ptr from the TR1 extensions of the C++ standard library.

Static Analysis

The second approach to memory leaks is referred to as static analysis and attempts to detect errors in your source-code. CodeSonar is one of the effective tools for detection. It provides checkers for the Power of Ten coding rules, and it is especially competent at procedural analysis. However, some might find it lagging for bigger code bases.

How to Handle a Memory Leak

For some memory leaks, the only solution is to read through the code to find and correct the error. Another one of the common approaches to C++ is to use RAII, which an acronym for Resource Acquisition Is Initialization. This approach means associating scoped objects using the acquired resources, which automatically releases the resources when the objects are no longer within scope. RAII has the advantage of knowing when objects exist and when they do not. This gives it a distinct advantage over garbage collection. Regardless, RAII is not always recommended because some situations require ordinary pointers to manage raw memory and increase performance. Use it with caution.

The Most Serious Leaks

Urgency of a leak depends on the situation, and where the leak has occurred in the operating system. Additionally, it becomes more urgent if the leak occurs where the memory is limited such as in embedded systems and portable devices.

To protect code from memory leaks, people have to stay vigilant and avoid codes that could result in a leak. Memory leaks continue until someone turns the system off, which makes the memory available again, but the slow process of a leak can eventually prejudice a machine that normally runs correctly.

 

Related:

The Five Principles of Performance

In Demand IT Skills

A project manager acts as the primary link between business and technical teams. A project manager is responsible for maintaining the project schedule, developing project estimates, working with external teams and tracking project issues. The project manager belongs to either the technical team or the project management office (PMO). The project manager works with business teams, technical teams, business counterparts, testing resources, vendors and infrastructure teams.

A project manager is often challenged with diagonally opposite views from the business side and technical side. A project manager’s success depends on balancing the needs and emotions of both sides.

Understanding the Requirements
A project manager must familiarize with the project’s requirements as defined by the business or product managers. This will help you understand the business vision behind the project. You will need this knowledge while negotiating with the technical teams.

Understanding the Technical Landscape
A project manager must also understand the technical systems, resource skills and infrastructure capabilities available for the project. Business teams come up with expectations that are sometimes beyond the capabilities of the technology team. It is the responsibility of the project manager to understand the technical capabilities available to the project.

Walkthrough of Business Requirements
This is a critical step in the project delivery process. The project manager must invite members from the business team, technical team, testing team, infrastructure team and vendors. The project manager must encourage the various stakeholders to ask questions about the requirements. Any prototypes available must be demonstrated in this meeting. The project manager must find answers to all questions resulting from the requirements walkthrough. The project manager must get the final version of the requirements approved by all stakeholders.

Managing Conflicts in Timelines and Budgets
All project managers will face the conflicts arising from shortened timelines and limited budgets. Business teams typically demand many features that are nearly impossible to deliver within short timeframes. The project manager must work with business and technical teams to prioritize the requirements. If the project is executed in a product development organization, then the project manager could utilize agile methodologies to deliver projects incrementally. In this case, the project manager may be required to act as a scrum master to facilitate scrum meetings between various stakeholders.

The Art of Saying “No”
As a project manager, you may be forced to say “no” to demands from both business and technology teams. However, it is important to create a win-win situation for all parties when you are faced with conflicting demands. You can work with the stakeholders individually before bringing all parties together. Most stakeholders prefer to work together. The success of a project manager depends on how effectively he or she can bring out the best in everyone, driving everyone towards a common goal.

Finally, the job of a project manager is not to satisfy the demands from all corners. The project manager must identify the essential deliverables that will meet the business needs, with a solid understanding of what is possible within the limits of technology.

 

Related:

Smart Project Management: Best Practices of Good Managers

Is Agism an Issue in IT?

What are the three most important things non-programmers should know about programming?
 
Written by Brian Knapp, credit and reprint CodeCareerGenius
 
 
Since you asked for the three most important things that non-programmers should know about, and I’ve spent most of my career working with more non-programmers than programmers, I have a few interesting things that would help.
 
Number One - It Is Impossible To Accurately Estimate Software Projects
 
No matter what is tried. No matter what tool, agile approach, or magic fairy dust people try to apply to creating software… accurately predicting software project timelines is basically impossible.
 
There are many good reasons for this. Usually, requirements and feature ideas change on a daily/weekly basis. Often it is impossible to know what needs to be done without actually digging into the code itself. Debugging and QA can take an extraordinary amount of time.
 
And worst of all…
 
Project Managers are always pushing for shorter timelines. They largely have no respect for reality. So, at some point they are given estimates just to make them feel better about planning.
 
No matter how much planning and estimation you do, it will be wrong. At best it will be directionally correct +/- 300% of what you estimated. So, a one year project could actually take anywhere between 0 and 5 years, maybe even 10 years.
 
If you think I’m joking, look at how many major ERP projects that go over time and over budget by many years and many hundreds of millions of dollars. Look at the F-35 fighter jet software issues.
 
Or in the small, you can find many cases where a “simple bug fix” can take days when you thought it was hours.
 
All estimates are lies made up to make everyone feel better. I’ve never met a developer or manager who could accurately estimate software projects even as well as the local weatherman(or woman) predicts the weather.
 
Number Two - Productivity Is Unevenly Distributed
 
What if I told you that in the average eight hour work day the majority of the work will get done in a 30 minute timeframe? Sound crazy?
 
Well, for most programmers there is a 30–90 minute window where you are extraordinarily productive. We call this the flow state.
 
Being in the flow state is wonderful and amazing. It often is where the “magic” of building software happens.
 
Getting into flow can be difficult. It’s akin to meditation in that you have to have a period of uninterrupted focus of say 30 minutes to “get in” the flow, but a tiny interruption can pull you right out.
 
Now consider the modern workplace environment. Programmers work in open office environments where they are invited to distract each other constantly.
 
Most people need a 1–2 hour uninterrupted block to get 30–90 minutes of flow.
 
Take the 8 hour day and break it in half with a lunch break, and then pile in a few meetings and all of a sudden you are lucky to get one decent flow state session in place.
 
That is why I say that most of the work that gets done happens in a 30 minute timeframe. The other 7–8 hours are spent being distracted, answering email, going to meetings, hanging around the water cooler, going to the bathroom, and trying to remember what you were working on before all these distractions.
 
Ironically, writers, musicians, and other creative professionals have their own version of this problem and largely work alone and away from other people when they are creating new things.
 
Someday the programming world might catch on, but I doubt it.
 
Even if this became obvious, it doesn’t sit well with most companies to think that programmers would be paid for an 8 hour day and only be cranking out code for a few hours on a good day. Some corporate middle manager would probably get the bright idea to have mandatory flow state training where a guru came in and then there would be a corporate policy from a pointy haired boss mandating that programmers are now required to spend 8 hours a day in flow state and they must fill out forms to track their time and notify their superiors of their flow state activities, otherwise there would be more meetings about the current flow state reports not being filed correctly and that programmers were spending too much time “zoning out” instead of being in flow.
 
Thus, programmers would spent 7–8 hours a day pretending to be in flow state, reporting on their progress, and getting all their work done in 30 minutes of accidental flow state somewhere in the middle of all that flow state reporting.
 
If you think I’m joking about this, I’m not. I promise you this is what would happen to any company of more than 2 employees. (Even the ones run by programmers.)
 
Number Three - It Will Cost 10x What You Think
 
Being a programmer, I get a lot of non-programmers telling me about their brilliant app ideas. Usually they want me to build something for free and are so generous as to pay me up to 5% of the profits for doing 100% of the work.
 
Their ideas are just that good.
 
Now, I gently tell them that I’m not interested in building anything for free.
 
At that point they get angry, but a few ask how much it will cost. I give them a reasonable (and very incorrect) estimate of what it would cost to create the incredibly simple version of their app idea.
 
Let’s say it’s some number like $25,000.
 
They look at me like I’m a lunatic, and so I explain how much it costs to hire a contract programmer and how long it will actually take. For example’s sake let’s say it is $100/hr for 250 hours.
 
To be clear, these are made up numbers and bad estimates (See Number One for details…)
 
In actuality, to build the actual thing they want might cost $250,000, or even $2,500,000 when it’s all said and done.
 
Building software can be incredibly complex and expensive. What most people can’t wrap their head around is the fact that a company like Google, Apple, or Microsoft has spent BILLIONS of dollars to create something that looks so simple to the end user.
 
Somehow, the assumption is that something that looks simple is cheap and fast to build.
 
Building something simple and easy for the end user is time consuming and expensive. Most people just can’t do it.
 
So, the average person with a brilliant app idea thinks it will cost a few hundred or maybe a few thousand dollars to make and it will be done in a weekend is so off the mark it’s not worth considering their ideas.
 
And programmers are too eager to play along with these bad ideas (by making bad estimates and under charging for their time) that this notion is perpetuated to the average non-programmer.
 
So, a good rule of thumb is that software will cost 10 times as much as you think and take 10 times as long to finish.
 
And that leads to a bonus point…
 
BONUS - Software Is Never Done
 
Programmers never complete a software project, they only stop working on it. Software is never done.
 
I’ve worked at many software companies and I’ve never seen a software project “completed”.
 
Sure, software gets released and used. But, it is always changing, being updated, bugs get fixed, and there are always new customer requests for features.
 
Look at your favorite software and you’ll quickly realize how true this is. Facebook, Instagram, Google Search, Google Maps, GMail, iOS, Android, Windows, and now even most video games are never done.
 
There are small armies of developers just trying to keep all the software you use every day stable and bug free. Add on the fact that there are always feature requests, small changes, and new platforms to deal with, it’s a treadmill.
 
So, the only way out of the game is to stop working on software. At that point, the software begins to decay until it is no longer secure or supported.
 
Think about old Windows 3.1 software or maybe old Nintendo Cartridge video games. The current computers and video game consoles don’t even attempt to run that software anymore.
 
You can’t put an old video game in your new Nintendo Switch and have it “just work”. That is what happens when you think software is done.
 
When programmers stop working on software the software starts to die. The code itself is probably fine, but all the other software keeps moving forward until your software is no longer compatible with the current technology.
 
So, those are the four most important things that non-programmers should know about programming. I know you asked for only three, so I hope the bonus was valuable to you as well.

A whole new world was thrown wide open with the advent of the concept of open source. The biggest advantage of open source projects is the easy availability of the source code and also the rights to tweak it or modify the code as we deem fit.

Listed below are some top open source projects that are making waves with their innovative ideas at this moment.

ProjectLibre

Project Libre is the open source replacement of Microsoft Project. It was one among the top 10 open source projects of 2013. With over 6 million downloads; it has most certainly captured the imagination of people around the world. Details of project Libre could be found at http://www.projectlibre.org/ . Project Libre has separate release for mainframes. It also has a web based version which further increases its overall appeal. One of the main advantages is that it has a list of tasks that can be tracked to closure. It can also be used in conjunction with LibreOffice to provide a great set of tools to the team leaders.

Diaspora

Tech Life in Florida

Software developers in Florida, have reasonably great opportunities for development positions in Fortune 1000 companies scattered throughout the state. In town and in reach, Floridians have access to corporate headquarters for Citrix Systems, Tech Data Corporation, the SFN Group, and the Harris Corporation just to name a few.
Where is the information? Where is the data? Lost in the #@%!&database! Joe Celko
other Learning Options
Software developers near Delray Beach have ample opportunities to meet like minded techie individuals, collaborate and expend their career choices by participating in Meet-Up Groups. The following is a list of Technology Groups in the area.
Fortune 500 and 1000 companies in Florida that offer opportunities for Java Programming developers
Company Name City Industry Secondary Industry
Lender Processing Services, Inc. (LPS) Jacksonville Software and Internet Data Analytics, Management and Storage
World Fuel Services Corporation Miami Energy and Utilities Gasoline and Oil Refineries
SEACOR Holdings Inc. Fort Lauderdale Transportation and Storage Marine and Inland Shipping
MasTec, Inc. Miami Business Services Security Services
Health Management Associates, Inc. Naples Healthcare, Pharmaceuticals and Biotech Hospitals
B/E Aerospace, Inc. Wellington Manufacturing Aerospace and Defense
Roper Industries, Inc. Sarasota Manufacturing Manufacturing Other
AutoNation Fort Lauderdale Retail Automobile Dealers
Watsco, Inc. Miami Wholesale and Distribution Wholesale and Distribution Other
SFN Group Fort Lauderdale Business Services HR and Recruiting Services
Tupperware Corporation Orlando Manufacturing Plastics and Rubber Manufacturing
AirTran Holdings, Inc. Orlando Travel, Recreation and Leisure Passenger Airlines
WellCare Health Plans, Inc. Tampa Healthcare, Pharmaceuticals and Biotech Healthcare, Pharmaceuticals, and Biotech Other
Lennar Corporation Miami Real Estate and Construction Real Estate Agents and Appraisers
HSN, Inc. Saint Petersburg Retail Retail Other
Certegy Saint Petersburg Business Services Business Services Other
Raymond James Financial, Inc. Saint Petersburg Financial Services Trust, Fiduciary, and Custody Activities
Winn-Dixie Stores, Inc. Jacksonville Retail Grocery and Specialty Food Stores
Jabil Circuit, Inc. Saint Petersburg Computers and Electronics Semiconductor and Microchip Manufacturing
CSX Corporation Jacksonville Transportation and Storage Freight Hauling (Rail and Truck)
Fidelity National Financial, Inc. Jacksonville Financial Services Insurance and Risk Management
Tech Data Corporation Clearwater Consumer Services Automotive Repair & Maintenance
TECO Energy, Inc. Tampa Manufacturing Chemicals and Petrochemicals
Lincare Holdings Inc Clearwater Healthcare, Pharmaceuticals and Biotech Medical Supplies and Equipment
Chico's FAS Inc. Fort Myers Retail Clothing and Shoes Stores
Burger King Corporation LLC Miami Retail Restaurants and Bars
Publix Super Markets, Inc. Lakeland Retail Grocery and Specialty Food Stores
Florida Power and Light Company Juno Beach Energy and Utilities Gas and Electric Utilities
Ryder System, Inc. Miami Transportation and Storage Freight Hauling (Rail and Truck)
Citrix Systems, Inc. Fort Lauderdale Software and Internet Software and Internet Other
Harris Corporation Melbourne Telecommunications Wireless and Mobile
Office Depot, Inc. Boca Raton Computers and Electronics Audio, Video and Photography
Landstar System, Inc. Jacksonville Transportation and Storage Freight Hauling (Rail and Truck)
Darden Restaurants, Inc. Orlando Retail Restaurants and Bars
PSS World Medical, Inc. Jacksonville Healthcare, Pharmaceuticals and Biotech Medical Supplies and Equipment

training details locations, tags and why hsg

A successful career as a software developer or other IT professional requires a solid understanding of software development processes, design patterns, enterprise application architectures, web services, security, networking and much more. The progression from novice to expert can be a daunting endeavor; this is especially true when traversing the learning curve without expert guidance. A common experience is that too much time and money is wasted on a career plan or application due to misinformation.

The Hartmann Software Group understands these issues and addresses them and others during any training engagement. Although no IT educational institution can guarantee career or application development success, HSG can get you closer to your goals at a far faster rate than self paced learning and, arguably, than the competition. Here are the reasons why we are so successful at teaching:

  • Learn from the experts.
    1. We have provided software development and other IT related training to many major corporations in Florida since 2002.
    2. Our educators have years of consulting and training experience; moreover, we require each trainer to have cross-discipline expertise i.e. be Java and .NET experts so that you get a broad understanding of how industry wide experts work and think.
  • Discover tips and tricks about Java Programming programming
  • Get your questions answered by easy to follow, organized Java Programming experts
  • Get up to speed with vital Java Programming programming tools
  • Save on travel expenses by learning right from your desk or home office. Enroll in an online instructor led class. Nearly all of our classes are offered in this way.
  • Prepare to hit the ground running for a new job or a new position
  • See the big picture and have the instructor fill in the gaps
  • We teach with sophisticated learning tools and provide excellent supporting course material
  • Books and course material are provided in advance
  • Get a book of your choice from the HSG Store as a gift from us when you register for a class
  • Gain a lot of practical skills in a short amount of time
  • We teach what we know…software
  • We care…
learn more
page tags
what brought you to visit us
Delray Beach, Florida Java Programming Training , Delray Beach, Florida Java Programming Training Classes, Delray Beach, Florida Java Programming Training Courses, Delray Beach, Florida Java Programming Training Course, Delray Beach, Florida Java Programming Training Seminar

Interesting Reads Take a class with us and receive a book of your choosing for 50% off MSRP.